The previously installed concrete trench access covers over an oxygen pipework trench at this hospital were causing a number of issues due to both their weight and deterioration.
Fibrelite provided a lightweight retrofit replacement for failing heavy concrete trench access covers over an existing oxygen pipework trench at this UK hospital.
The Fibrelite technical team attended the site to conduct a full survey, following which they custom-designed and manufactured a bespoke retrofit covering solution which fit directly into the existing frames.
This hospital now has a trench access covering solution which can be safely and quickly removed manually by two people and will provide many years of trouble-free service.



Recent Comments